| |
Mar 14, 2026
|
|
|
|
|
PE 4043 Drilling Engineering II (3 hours) Directional drilling mechanics, drill bit mechanics, drillstring mechanics, pore and fracture pressure predictions, drilling problems, well planning. Prerequisites: PE 3013 , PE 3043 .
Add to Bulletin (opens a new window)
|
|