|
Nov 26, 2024
|
|
|
|
PE 7023 Advanced Production Design(3 hours) Total system associated with production and transportation of oil and gas. Prediction of phase behavior and fluid physical properties, inflow performance relationships, flow through completions, steady state multiphase flow through pipes and restrictions. Comprehensive design project. Prerequisites: ES 3003 and PE 3073 or permission of instructor.
Add to Bulletin (opens a new window)
|
|