Mar 28, 2024  
2019-2020 Graduate Bulletin 
    
2019-2020 Graduate Bulletin [ARCHIVED BULLETIN]

Add to Bulletin (opens a new window)

PE 6473 Production Engineering II

(3 hours)
Overview and application of common methods for artificially lifting oil wells, dewatering gas wells and boosting deepwater production; detailed theory, design and troubleshooting of the important artificial lift methods, including continuous gas lift, beam pumping, electrical submersible pumping and progressing cavity pumps. Prerequisite: PE 3073 and either PE 3013 or ES 2513.



Add to Bulletin (opens a new window)