|
Sep 22, 2024
|
|
|
|
PE 4073 Production Engineering II (3 hours) Overview and application of common methods for artificially lifting oil wells, dewatering gas wells and boosting deepwater production; detailed theory, design and troubleshooting of the important artificial lift methods, including continuous gas lift, beam pumping, electrical submersible pumping and progressing cavity pumps. Prerequisites: PE 3073 and either PE 3013 or ES 2513 .
Add to Bulletin (opens a new window)
|
|