|
Sep 22, 2024
|
|
|
|
PE 3041 Drilling Lab (1 hour) Drilling Simulator Lab: Controls, operations, data acquisition, hydraulics, BOP and well control, rate of penetration vs. drill variables. Mud Lab: Measurements of drilling mud properties, mud additives, mud contaminants, mud liquid solids measurements. Prerequisite: PE 3043 .
Add to Bulletin (opens a new window)
|
|