Apr 26, 2024  
2017-2018 Undergraduate Bulletin 
    
2017-2018 Undergraduate Bulletin [ARCHIVED BULLETIN]

Add to Bulletin (opens a new window)

PE 4073 Production Engineering II


(3 hours)
Overview and application of common methods for artificially lifting oil wells, dewatering gas wells and boosting deepwater production; detailed theory, design and troubleshooting of the important artificial lift methods, including continuous gas lift, beam pumping, electrical submersible pumping and progressing cavity pumps. Prerequisites:  PE 3073  and either PE 3013  or ES 2513 .



Add to Bulletin (opens a new window)